August 2008 - December 2008

    AMEC Site Visit
    Çanaklı 99 Spectrometer Analysis
    Çanaklı 22 Pit
    Çanaklı 22 Pit ACME Major & Trace Element Analysis of 92 systematic samples.
    AMEC 16 Trench + 22 Pit Report (November)
    Sending Systematic Samples to CFM for KIM Analysis and Caustic Fusion Analysis
    (Kuyubaşı, Beşkonak, Dereköy, Çanaklı)
    AMEC Site Visit Report (December)

October 2008 - November 2008

    AMEC Site Visit
    AMEC Report / Geology-Hydrogeology

December 2008 - August 2009

    Çanaklı 22 Drilling
    Çanaklı 22 Drilling ACME MAjor & Trace Element Analysis of 444 systematic samples
    Australia - Downer Edi Mining Çanaklı Metallurgical Characterisalion Study 1
    Australia - Downer Edi Mining Çanaklı Metallurgical Characterisalion Study 2
    Hacettepe University - 300 grains - SEM-Electronmicroprobe Analysis
    İstanbul Technical University - 200 grains - Micro Raman Analysis
    AMEC Prelimary Resource (August 2009)

July 2009 - March 2010

    Çanaklı Operating Licence has been obtained
    A Certificate for the Permission of the mining Operations has been obtained
    Business Operation Licence has been obtained
    The Environmental Effect Evaluation Certificate has been obtained
    For the 10 heclare area, 10 Years rent constracts have been completed
    The construction of chutes on which the plant is placed have been completed
    A consigned Magnetic Drum Separator for Pilot Tesis has been arrived
    The Electricity Transmission Line has been constructed
    The construction of a road has been finished
    Pilot Test studies for Çanaklı Plant Equipment have been completed successfully at China
    All Machinery and Equipments for Çanaklı Plant have been ordered

March 2010

    CFM Report-Micro Diamond & Moissanites and REE & Thorium Minerals corroboration

May 2010

    Meeting with Dr. C.K. Gupla - Star Earth Minerals concerning Extractive Metallurgy

May 2010 - November 2010

    All Machinery and Equipments for Çanaklı Plant have been delivered and installed
    Pilot Production has been commenced

December 2010- March 2011

    AMR has started to sell Magnetite in Turkey, Bosnia and Herzegovina, Spain
    Heavy Mineral Concentrates are being stocked for Extractive Metallurgy
    Planning and Implementation has been started for Step I, Step II and Step III Production
    Lab Scale and Pilot Scale Extractive Metallurgy Tests have commenced in India